| Balanced to provide drillers ease of operation |
| All controls located at the backhead of the drill |
| Push button control for quick leg retraction. |
| Front end porting for full lubricaton of chuck parts |
| Sustained high penetration to the bottom of the hole |
| Torque sufficient to install mechanical rock bolts. |
| Water pressure can be regulated automatically |
| Sure-lock steel puller mounted on front end. |
| New and improved pusher leg - corrosion proof. |
Specifications 60M
SAL60M Stoper
PHQ250 Drills
Drill Index
Request
Quotation