DATE:

January 26 & 27, 1999
ROCK BOLT TYPE:
Skema Friction Stabilizers

IN ATTENDANCE:
Bill Quesnel, Len Leblanc - PHQ

Eric Nelson Consultant

Mark Poulin, Doug Luhta, Mike Mooney - NORCAT

PURPOSE
Installation, pull test and removal of Skema split tube assemblies.

LOCATION
NORCAT Underground Centre, Onaping, Ontario

Test # Bolt Diam. Bolt Length Bit Diam. Pull Test Results
1 1.335" 6ft. 1.280" 6.5tons (ss-33 equivalent)
2 1.337" 6ft. 1.280" 9.5 tons (ss33 equivalent)
3 1.335" 6ft. 1.280" 6.0 tons (ss-33 equivalent)
4 1.555" 6ft. 1.364" 8.0 tons (ss-39 equivalent)
5 1.560" 6ft. 1.364" 11.0 tons (ss-39 equivalent)

1. Holes were drilled by jackleg (115 psi drill pressure).  Installation of split set tubes was also by jackleg using generic style driver tool.  This caused some flaring of ring ends & loss of impact energy.

2. Pull tests were conducted using Enerpac RCH 302 center hole jack and claw style pull assembly.    Instructions Hydraulic Rock Bolt Tester PDF

3. Tubes #1 & #5 were marked & removed for NORCAT corrosion testing

Send mail to webmaster@partshq.com with questions or comments about this web site or travel to Reach Us.

Copyright 1997 Parts HeadQuarters Inc. All rights reserved. Information in this document is subject to change without notice.
Other products and companies referred to herein are trademarks or registered trademarks of their respective companies or mark holders.


Last modified: March 14, 2017